SANDAG logo
Reports on I-805
I-805
Between Exit 27A: Mira Mesa Boulevard and Exit 27B: Sorrento Valley Road (San Diego). Road maintenance work is in progress. Until June 28, 2024 at about 6:01AM PDT.
Between Exit 27: Mira Mesa Boulevard; Sorrento Valley Road and the end of I-805 (San Diego). A traffic incident is reported.