SANDAG logo
SR 163
SR 163 northbound: Major event, through lane.
Between Exit 1A: I-5 North and Exit 1B: Quince Street (San Diego). There is a major event. Through lanes.
SR 163 northbound: Road maintenance operation.
Between Exit 1C: Richmond Street and Exit 2A: Robinson Avenue (San Diego). Road maintenance work is in progress. Until December 31, 2999 at about 10:59PM PDT.
SR 163 southbound: Paving operation.
Between Exit 3B: I-8 West; Friars Road; Hotel Circle and Exit 10: Kearny Villa Road (San Diego). The road is being repaved. Until today at about 2:30PM PDT.
SR 163 northbound: Paving operation.
Between Exit 3B: I-8 West; Friars Road; Hotel Circle and Exit 10: Kearny Villa Road (San Diego). The road is being repaved. Until today at about 2:30PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on SR 163
Map of Reports on SR 163 Between Exit 3B: I-8 West; Friars Road; Hotel Circle and Exit 10: Kearny Villa Road (San Diego). The road is being repaved. Until today at about 2:30PM PDT. Between Exit 3B: I-8 West; Friars Road; Hotel Circle and Exit 10: Kearny Villa Road (San Diego). The road is being repaved. Until today at about 2:30PM PDT.
SR 163 northbound: Major event, through lane.
SR 163 northbound: Road maintenance operation.
SR 163 southbound: Paving operation.
SR 163 northbound: Paving operation.
Google Static Map Image
Incidents Incidents Construction Construction