SANDAG logo
I-5
I-5: Road maintenance operation.
Between Exit 18B: Washington Street and Exit 19: Old Town Avenue; Moore Street (San Diego). Road maintenance work is in progress. Until August 31, 2022 at about 5:01PM PDT.
I-5: Road maintenance operation.
Between Exit 18B: Washington Street and Exit 19: Old Town Avenue; Moore Street (San Diego). Road maintenance work is in progress. Until August 31, 2022 at about 5:01PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-5
Map of Reports on I-5
I-5: Road maintenance operation.
I-5: Road maintenance operation.
Google Static Map Image
Incidents Incidents Construction Construction