SANDAG logo
SR 163
SR 163 southbound: Road maintenance operation.
Between Exit 1B: Quince Street and Exit 1C: Richmond Street (San Diego). Road maintenance work is in progress. Until today at about 6:01PM PST.
SR 163 northbound: Bridge maintenance operation.
Between Exit 2B: Washington Street and Exit 3A: El Centro I-8 East (San Diego). Bridge maintenance work is in progress. Until today at about 5:01AM PST.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on SR 163
Map of Reports on SR 163 Between Exit 2B: Washington Street and Exit 3A: El Centro I-8 East (San Diego). Bridge maintenance work is in progress. Until today at about 5:01AM PST.
SR 163 southbound: Road maintenance operation.
SR 163 northbound: Bridge maintenance operation.
Google Static Map Image
Incidents Incidents Construction Construction