SANDAG logo
I-15: Escondido to Murrieta
I-15 southbound: Paving operation.
Between Exit 32: SR 78 and I-15 Business; Center City Parkway (Escondido). The road is being repaved. Until October 31, 2023 at about 5:01AM PDT.
I-15 southbound: Paving operation.
Between Exit 32: SR 78 and Exit 37: W San Marcos Blvd; Deer Springs Road; Mountain Meadow Road (Escondido). The road is being repaved. Until October 31, 2023 at about 5:01AM PDT.
I-15 southbound: Paving operation.
Between I-15 Business; Center City Parkway and Exit 37: W San Marcos Blvd; Deer Springs Road; Mountain Meadow Road (Escondido). The road is being repaved. Until October 31, 2023 at about 5:01AM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-15: Escondido to Murrieta
Map of Reports on I-15 Between Exit 32: SR 78 and I-15 Business; Center City Parkway (Escondido). The road is being repaved. Until October 31, 2023 at about 5:01AM PDT. Between Exit 32: SR 78 and Exit 37: W San Marcos Blvd; Deer Springs Road; Mountain Meadow Road (Escondido). The road is being repaved. Until October 31, 2023 at about 5:01AM PDT. Between I-15 Business; Center City Parkway and Exit 37: W San Marcos Blvd; Deer Springs Road; Mountain Meadow Road (Escondido). The road is being repaved. Until October 31, 2023 at about 5:01AM PDT.
I-15 southbound: Paving operation.
I-15 southbound: Paving operation.
I-15 southbound: Paving operation.
Google Static Map Image
Incidents Incidents Construction Construction